×
Laden...

The Acton House - 6

1 Mitglied

The framing crew continues working on the addition; a large steel beam to carry out the upper floor is lowered into place. A framer demonstrates a pneumatic tool for attaching metal hangers to wood. The guys lay down the second floor deck, using construction adhesive and tongue and groove plywood. Inside, we find Terry Maitland putting in a footing for the missing basement lally column. We then meet a lead paint inspector, who uses an x-ray machine to gauge the presence and concentration of lead paint in the old building. Tom Silva works on replacing the rotten and underframed back of the old building. We meet a lightning protection inspector from Underwriters Labs, who assesses the building's system.

Nächste Episode
S16E07 - The Acton House - 7

Episoden

Ähnliche Serien (10)

Ask This Old House
Ask This Old House
Home Free (2015)
Home Free (2015)
American Dream Builders
American Dream Builders
House Hunters Renovation
House Hunters Renovation
Home Town Takeover
Home Town Takeover
Homes Across America
Homes Across America
Restored
Restored
The World's Most Extraordinary Homes
The World's Most Extraordinary Homes
Extreme Makeover: Home Edition
Extreme Makeover: Home Edition
House Rules (AU)
House Rules (AU)