×
Caricamento in corso

The Milton House - 4

1 membro

Our master carpenter lays out lines for subslab ductwork in his workshop, and the crew strips off the barn's old shingles. They will use a shingle panel system when they replace the siding. Tom Silva shows us his new jobsite trailer, leased complete with office and secure storage room. A surveyor works to put together a certified plot plan, while we see the excavation work around the main house for the kitchen foundation and for a perimeter drain along the front rubblestone foundation for years. In the barn, our master carpenter puts in one of the new post to make room for the garage to come - earlier he used new one-piece footing forms and a waterborne lazer level to provide solid bases for the new posts, poured by a small-batch concrete delivery truck. In the future media room, the crew removes the lally column, holding up the building with jacks and a cripple wall before inserting a flitch beam of laminated veneer lumber and steel.

Prossimo episodio
S19E05 - The Milton House - 5

Episodi

Serie simili (10)

Ask This Old House
Ask This Old House
Home Free (2015)
Home Free (2015)
American Dream Builders
American Dream Builders
House Hunters Renovation
House Hunters Renovation
Home Town Takeover
Home Town Takeover
Homes Across America
Homes Across America
Restored
Restored
The World's Most Extraordinary Homes
The World's Most Extraordinary Homes
Extreme Makeover: Home Edition
Extreme Makeover: Home Edition
House Rules (AU)
House Rules (AU)